Construction consultation

01

shirring

This is a record of the techniques and ingenuity accumulated in the field.

FIELD REPORT

On-site content

It was shirring. Western Service helped us with the crane. Although the dismantling method was different from what I had expected, CM's Engineering Co., Ltd. did a great job of disassembling it ^_^ It was able to be removed very smoothly. thank you. Thank you to everyone.

case number
01
Main contents
shirring
Corresponding attitude
We check site conditions and develop construction methods while considering safety and work efficiency.
Consult about similar construction