FIELD JOURNAL

Hisatec's work

A record of the techniques and ingenuity accumulated in the field.

HOW WE SOLVE

Answers for each site,Make it in 4 steps.

Even if the work name is the same, the conditions are different one by one. Construction is carried out after repeated checks and improvements.

  1. CONDITIONread the terms

    Check dimensions, weight, and flow lines

  2. METHODchoose a method

    Optimize equipment and procedures

  3. TEAMwork together

    Share safety information with stakeholders

  4. RESULTbe sure to pay

    Check quality and completion status

OUR WORKS

At each site,the best answer.

From transporting and installing heavy objects to construction under special conditions. You can view all the work and on-site photos posted on the current site in their original size.

shirring
shirring

01

shirring

It was shirring. Western Service helped us with the crane. Although the dismantling method was different from what I had expected, CM's Engineering Co., Ltd. did a great job of disassembling it ^_^ It was able to be removed very smoothly. thank you. Thank you to everyone.

See photos and site details in detail
gondola shakedown
gondola shakedown

02

gondola shakedown

It was a gondola shakedown. Thank you Futaba Giken for your request ^_^ I was able to study on Mr. Daiyu's gondola, and I had time, so I made this. We look forward to receiving your request again.

See photos and site details in detail
35t rough terrain crane
35t rough terrain crane

03

35t rough terrain crane

We worked on a site that was perfect for a 35t rough terrain crane. It went in perfectly in one shot! The 0.25 Yumbo (backhoe) was raised at the beginning of the month, the demolition work progressed, and the work was to lower the Yumbo. This time, we received help from Tanaka Heavy Equipment Industry. Thank you as always.

See photos and site details in detail
20ft sign container size
20ft container size

05

20ft sign container size

That's what I mean when I say it can be loaded with a fork! ? , No, that's not right, tell Kazuko Transport that it's impossible! I managed to load one unit with Unic, but the other one is heavier! What's more, I had heard about 20-foot dry containers, but when I was setting up the container trolley for the 20-foot container size I had made, it wouldn't fit! Plus, I didn't hear about taking it out of the building lol lol I had two forks, so that was a good thing. I was beaten. Apparently the customer directly above me wasn't shown anything either. After all, you should not work with someone who cannot confirm the details. I learned a lot too. I left, wondering what would happen to the person loading the truck if it was damaged so much.^_^

See photos and site details in detail
Hisatec walkie lift
Equipment delivery using walkie lift

06

walkie lift

For the second time on Saturday, I went to the site that had been cleared in the morning to participate. The machines were working, and it was extremely hot. Everyone did their best despite the heat ^_^And we were so disappointed that we were ahead of schedule. Thank you everyone. I almost fell over, but it was fun lol thank you.

See photos and site details in detail
Removal and transport work
Removal and transport work

07

Removal and transport work

The schedule for 2.5 days ended up being 4 days full due to additions etc. This is removal work. Everyone worked hard and finished it well. I was able to get help with the trestle stage and it went well ^ ^ Thank you.

See photos and site details in detail
Signboard renovation
Temporary construction work for signboard renovation

08

Signboard renovation

Temporary construction work for signboard renovation. The signboard is now beautiful ^ ^ Good. For two weeks in a row, we used temporary construction to raise and lower materials in order to raise and lower the roof. Thank you for finishing this safely.

See photos and site details in detail
Tower crane dismantling work
13t rough terrain crane used for demolition work

10

Tower crane dismantling

In a limited work space, we used a 13t rough terrain crane to dismantle and transport the tower crane, which had been lowered to near the ground by reverse climbing. Work is completed with emphasis on safety and setup while checking surrounding conditions.

See photos and site details in detail
Exterior view of warehouses of affiliated companies
Affiliated company warehouse

12

Affiliated company warehouse

This is a record of a visit to the warehouse of an affiliated company. We confirmed the equipment and storage environment that supports the site, and deepened our collaboration for future projects.

See photos and site details in detail
Carrying in the electrical panel
high hand lift

14

Carrying in the electrical panel

The electrical panel was brought in. It's been a while since I've been there, so I didn't take many pictures lol I went up the stairs to the height full of Uniques (a mistake in my calculations lol), and I set the height of the stage to the entrance of the door at the landing, and thought I'd be able to catch it with my hand (also a mistake in my calculations), but I ended up getting it in with a roll lol Once I entered the door, I put it on a 3t long hand and went through the passage to the next gate. There will be a hurdle around 220H, which you will overcome by switching from a 3t long hand to a 1.5t small hand. After crossing it, it turns 90 degrees, and next there are three Φ65 pipes lying side by side. This was accomplished by putting a roller on top of the hand and the van and rolling it from hand to hand. Once you cross it, a platform will appear. The height of the pedestal installed earlier is 500H. This time, how about a short high hand lift that lifts 450H with 1t? I changed hands from the side and put it in the other way (well, I thought it would turn lol), so I turned it 180 degrees at the last minute. Then, I jacked it up with my high hand, and since it is 500H, it will arrive once I receive it ^ ^ Then, since it will exceed the height of the pedestal, I slide it vertically with a roller from side to side and into position. Then, raise it a little with the crowbar, bring the roller to the middle, take turns pulling it out, and land. When all that was left was to show the level, I was relieved of my role and was sent elsewhere. I enjoyed it. Now, how many hand lifts did you use to insert one board? Lol lol It was a hand lift festival ^ ^ And thank you very much for cleaning up and coming home ^ ^

See photos and site details in detail
Walkie lift with a maximum load of 900kg
Electric hand lift with a maximum load of 1.5t

15

walkie lift

The blue walkie lift has a maximum load of 900kg and can be used for indoor transportation where lifting height is required. The red and black machines are electric hand lifts with a maximum load of 1.5t, and are used differently depending on the purpose and load.

See photos and site details in detail
Carrying in gate-shaped machinery and raising it from its bed

16

Bringing in machinery (gate type/raised up)

A gate was constructed to match the delivery route and ceiling height, and the press was safely lifted and raised from its bed. We carefully move the machine to the installation location while checking its center of gravity and surrounding equipment.

See photos and site details in detail
130t all terrain crane
high hand lift

17

130t all terrain crane

Today we were helped by a 130t all-terrain crane. The main thing was lifting a backhoe, but since it was in the afternoon, I couldn't take any pictures ^ ^ It seems that the KA-1300SL of Yasuho Crane Lease, which can often be seen on the TCL logo, came to see us ^ ^ Thank you very much.

See photos and site details in detail
loading crane
crab crane

18

loading crane

I'm a Uniq operator who hurriedly helped with the transport.^^It looks like we'll be moving to the installation site tomorrow. After I was excused from my role here, I went to Kyoto to support me ^ ^

See photos and site details in detail
Arita industry
Izumi Crane

19

Arita Kogyo | Wooden nursing home construction

This is Arita Kogyo's wooden nursing home construction site. The large-scale one-story building, approximately 50m deep, has been divided into sections, and the construction of the wooden frame is proceeding safely.

See photos and site details in detail
Transformer renewal work in underground equipment room

21

Transformer renewal work

Three transformers were replaced overnight in an equipment room in the basement of an apartment building. We confirmed the narrow delivery route and existing equipment, and safely completed the removal, delivery, and installation.

See photos and site details in detail
Backhoe lifting with 100t rough terrain crane
100t rough terrain crane work

22

100t rough terrain crane work

A 100t rough terrain crane was used to lift the backhoe to the top of the building. We check the work radius, lifting load, and surrounding obstacles in advance, and work in a safe arrangement and procedure.

See photos and site details in detail
Machine removal work using a crane
Crane work site

23

crane work

A combination of cranes, electric hand lifts, and walkie lifts were used to remove the factory equipment. We select equipment according to site conditions and proceed with the removal process safely and efficiently.

See photos and site details in detail
Building demolition work site

24

Demolition work

This is the final stage of a long-term construction project that began with the demolition of the building. We use heavy machinery and cranes to safely remove demolition materials and proceed with the process while being considerate of the surrounding environment.

See photos and site details in detail
Painter replacement using crab crane
crab crane work

25

crab crane work

This is an example of using the crab crane that was being used at the time to replace the painting machine. We confirmed the dimensions and delivery route in advance, and completed the installation without building gates. We are currently discontinuing the use of crab cranes and moving to Dutch-made HOEFLON.

See photos and site details in detail
Nighttime lifting with a 100t rough terrain crane
100t rough terrain crane work

26

100t rough terrain crane work

We used a 100t rough terrain crane to lift a backhoe to the roof in a busy downtown area early in the morning. We work safely within limited time and space, taking into consideration the impact on traffic and surrounding buildings.

See photos and site details in detail
Concrete demolition/chilling work
Demolition work site

27

Demolition work

Chilling and demolition of existing concrete sections. Construction was carried out as planned while protecting surrounding equipment and taking into account dust, noise, and safe flow lines.

See photos and site details in detail
4t unic
4t unic

28

4t unic

They went to install the items that had been delayed since the beginning of this year ^ ^ It was just 4t Unique. It seems like it was easy because there wasn't much fighting ^ ^ I guess I just put it there! Please don't rush into it ^ ^ Thank you for your hard work,

See photos and site details in detail
20t rough terrain crane work
20t rough terrain crane placed on site

29

20t rough terrain crane work

This work uses a 20t rough terrain crane with a compact body and maneuverability. We checked the site conditions and work radius and made a plan to ensure safe lifting even in a limited space.

See photos and site details in detail
crab crane
crab crane

30

crab crane

A simple crab crane jib? A simplified version of the searcher hook. For now, it might be okay to lift 600kg lol. Let's move forward once we see improvements.

See photos and site details in detail
Demolition work site
Heavy equipment used for demolition work

31

Demolition work

The demolition work, which lasted about two months, proceeded while checking the site conditions and surrounding environment. We cooperated in each process, from demolition using heavy machinery, transporting generated materials, to ensuring safe flow lines, and successfully completed the project despite difficult conditions.

See photos and site details in detail
Arita industry
100t Rough Terrace Crane Hisatec Engineering Co., Ltd.

32

Arita industry

At Arita Kogyo's site, we are helping Niyama Crane with the construction of a 25R wooden structure. The width was less than 10m and the depth was 50m, but they had to do the foundation work on the back half first, then move on to the front. That's amazing ^ ^ Thank you for letting me participate ^ ^ We look forward to your continued support.

See photos and site details in detail
1.5t electric hand lift
crab crane

33

1.5t electric hand lift

New friends have joined us ^ ^ 1.5t electric hand lift, and Hilti items ^ ^ and Aobeni have also been added. After making some changes to the electric hand lift, I will repaint it in Hisatec color. Thank you everyone for your continued support.

See photos and site details in detail
Mr. Shimaden
Mr. Shimaden

34

Mr. Shimaden

Please take a close look. This is a camera image from the jib ^ ^ It's a good shot. It's 13R though. Everyone went to install the signboards that Shimaden had made. It was completed very well ^ ^ Thank you for your hard work.

See photos and site details in detail
matsumoto industry
100t Rough Terrace Crane Hisatec Engineering Co., Ltd.

35

matsumoto industry

At Matsumoto Sangyo's site, we were helped by Sanwa Crane's rare 65t all-terrain crane. It is a Liebherr machine called LTM1065NX-2. It is a machine that can be expected to perform in the 100t class depending on how it is used^ ^This signboard weighed about 5t, which was lighter than expected^ ^Thank you as always, everyone.

See photos and site details in detail
Sanwa Crane
crab crane

36

Sanwa Crane

Sanwa Crane helped me. The working radius of modern cranes is outrageous. It looks like I was able to get 2t in 50m lol, that's amazing! Our 100R was also working hard from early in the morning ^ ^ Thank you as always.

See photos and site details in detail
100t Rough Terrace Crane Hisatec Engineering Co., Ltd.
100t Rough Terrace Crane Hisatec Engineering Co., Ltd.

37

First dispatch of 100t rough terrain crane

This is a record of when Hisatec's 100t rough terrain crane was dispatched for the first time. We conducted the placement and lifting work with safety as our top priority, while checking the site conditions during rainy weather.

See photos and site details in detail
100t Rough Terrace Crane Hisatec Engineering Co., Ltd.
100t Rough Terrace Crane Hisatec Engineering Co., Ltd.

38

100t Rough-Terrain Crane — Hisatec Engineering Co., Ltd.

They installed a signboard for a 100t rough terrain crane. We asked Hakko Corporation to take on the challenge. Thank you! I made something really cool! As for the painting, Maruei Painting worked very hard and did an amazing job. I had Maruei Painting do some amazing painting in Nara. And we had Hakko Corporation make a wonderful signboard. I am very grateful to all of you. There is still some bodywork left, but let's call it complete for now. Thanks to everyone, we were able to create a very beautiful 100t rough terrain crane. thank you!

See photos and site details in detail
100t Rough Terrace Crane Hisatec Engineering Co., Ltd.
100t Rough Terrace Crane Hisatec Engineering Co., Ltd.

39

100t Rough-Terrain Crane — Hisatec Engineering Co., Ltd.

I was able to operate the 100t rough terrain crane, too lol. This child's operator had gone to the site, so I learned how to use the crane computer for the first time in a long time in order to receive the containers my colleagues brought in. When I attached the sign, I lowered the jib that was holding it next to it, and started by raising it from the bottom to the side. I researched how to store the jib and was able to do it properly ^ ^ Then, I set it up for work and was able to hang the container as well ^ ^ There were tools inside, so it was heavy lol I was able to hang it at 100 tons lol Also, a light truck also came to the garage, so we had a matching design, so it was a lot of laughter ^ ^ We were able to do this because everyone was around us. I'll do my best, so let's all move forward together ^ ^ Thank you for your support.

See photos and site details in detail

CONTACT

Built Around Actual Site Conditions. We Recommend the Best Method.

Contact

PHOTO ARCHIVE

Photos posted on the current site

All photos posted on the current Hisatec official website have been transplanted without any missing parts.

Hisatec published photo 1
Hisatec published photo 2
Hisatec published photo 3
Hisatec published photo 4
Hisatec published photo 5
Hisatec published photo 6
Hisatec published photo 7
Hisatec published photo 8
Hisatec published photo 9
Hisatec published photo 10
Hisatec published photo 11
Hisatec published photo 12
Hisatec published photo 13
Hisatec published photo 14
Hisatec published photo 15
Hisatec published photo 16
Hisatec published photo 17
Hisatec published photo 18
Hisatec published photo 19
Hisatec published photo 20
Hisatec published photo 21
Hisatec published photo 22
Hisatec published photo 23
Hisatec published photo 24
Hisatec published photo 25
Hisatec published photo 26
Hisatec published photo 27
Hisatec published photo 28
Hisatec published photo 29
Hisatec published photos 30
Hisatec published photo 31
Hisatec published photo 32
Hisatec published photo 33
Hisatec published photo 34
Hisatec published photo 35
Hisatec published photo 36
Hisatec published photo 37
Hisatec published photo 38
Hisatec published photo 39
Hisatec published photos 40
Hisatec published photo 41