FIELD REPORT
On-site content
For the second time on Saturday, I went to the site that had been cleared in the morning to participate. The machines were working, and it was extremely hot. Everyone did their best despite the heat ^_^And we were so disappointed that we were ahead of schedule. Thank you everyone. I almost fell over, but it was fun lol thank you.
- case number
- 06
- Main contents
- walkie lift
- Corresponding attitude
- We check site conditions and develop construction methods while considering safety and work efficiency.
Construction consultation
