FIELD REPORT
On-site content
The tower crane was being dismantled in a fairly narrow space. The other day I was climbing backwards and had reached the bottom, so I finished 13R around noon. Thank you very much for today ^ ^
- case number
- 10
- Main contents
- Kyoei Transport
- Corresponding attitude
- We check site conditions and develop construction methods while considering safety and work efficiency.
Construction consultation
