Tower crane dismantling

This is a record of the techniques and ingenuity accumulated in the field.

FIELD REPORT

On-site content

In a limited work space, we used a 13t rough terrain crane to dismantle and transport the tower crane, which had been lowered to near the ground by reverse climbing. Work is completed with emphasis on safety and setup while checking surrounding conditions.

case number
10
Main contents
Tower crane dismantling
Corresponding attitude
We check site conditions and develop construction methods while considering safety and work efficiency.