FIELD REPORT
On-site content
I went to Mr. Landsburg to replace his paint machine. I decided to change the plan to a crab crane instead of a portal, took some serious measurements, and drew up a drawing to give it a try.It looked pretty good, so I decided to take on the challenge. Looks like it turned out better than I expected
- case number
- 25
- Main contents
- 4t unic
- Corresponding attitude
- We check site conditions and develop construction methods while considering safety and work efficiency.
Construction consultation
