FIELD REPORT
On-site content
Chilling and demolition of existing concrete sections. Construction was carried out as planned while protecting surrounding equipment and taking into account dust, noise, and safe flow lines.
- case number
- 27
- Main contents
- Demolition work
- Corresponding attitude
- We check site conditions and develop construction methods while considering safety and work efficiency.
Construction consultation
