FIELD REPORT
On-site content
This is a record of when Hisatec's 100t rough terrain crane was dispatched for the first time. We conducted the placement and lifting work with safety as our top priority, while checking the site conditions during rainy weather.
- case number
- 37
- Main contents
- First dispatch of 100t rough terrain crane
- Corresponding attitude
- We check site conditions and develop construction methods while considering safety and work efficiency.
Construction consultation
